Sandy River Bridge Project Takes a Major Step Forward
The Sandy River Bridge project reached an important milestone this month: the Farmington Planning Board granted final approval.
The planned 340-foot, multi-use bridge will connect the Whistle Stop Trail with downtown Farmington, creating a safe and accessible crossing for pedestrians and snowmobilers. It will also strengthen connections between the trail system, local businesses, and western Maine’s broader outdoor recreation network.
This approval is the result of years of planning, collaboration, and advocacy by High Peaks Alliance, the Maine Bureau of Parks and Lands, the Town of Farmington, and many community partners and supporters. Once complete, the bridge will become part of the Whistle Stop Trail and will be owned and managed by the Bureau of Parks and Lands.
We’re grateful to everyone who has helped move this long-awaited project forward. The bridge will be an important investment in outdoor access, community connectivity, and the future of downtown Farmington.
Updated renderings of the Sandy River Bridge are below.
Updated Renderings: Sandy River Bridge
These updated renderings show the proposed 340-foot, multi-use Sandy River Bridge and its connection to the Whistle Stop Trail and downtown Farmington. The bridge will create a safe, accessible crossing for pedestrians and snowmobilers while improving trail access and community connectivity.






